Hospital 1250KVA
The ILS team have commissioned the CDHB St Andrews Outpatients 11kV Substation build. The equipment consisted of a 4 way 630amp 11kV Eaton Switchgear supplying 2 transformers. Total load of 1250kVA.
The ILS team have commissioned the CDHB St Andrews Outpatients 11kV Substation build. The equipment consisted of a 4 way 630amp 11kV Eaton Switchgear supplying 2 transformers. Total load of 1250kVA.